Opening story…
కథనం తెరుస్తున్నాం…
Opening story…
కథనం తెరుస్తున్నాం…

Prime Minister Narendra Modi is scheduled to inaugurate Pune Metro’s Line 3 and lay foundation stones for Phase-II corridors on November 3 at 12:30 p.m. by video conference. The PMO puts the combined value at around ₹21,800 crore, distinguishing an already-built line from proposed expansion works.
The approximately 23-km Pink Line connects Maan with District Court station and is intended to link the Hinjewadi IT hub with Shivajinagar. The release says it was built at a cost exceeding ₹8,300 crore. It does not provide passenger opening hours, fares or a booking arrangement.
Phase-II is estimated at around ₹13,500 crore. Its planned corridors are:
The PMO says women train operators will operate the Pink Line, with around 30% of electricity requirements envisaged to come from solar power. The solar share is a planned provision, not a measured operating result.
The November 3 programme remains scheduled. A foundation stone for Phase-II is not confirmation that those corridors are complete, and the release gives no completion date for them.
Source: Prime Minister’s Office, through Press Information Bureau, November 2, 2026, release 2331557.
More context. A clearer perspective.
Loading comments…
KROV · CONVERSATION
Comments
Share your perspective respectfully. Comments appear after review. Please do not share personal information.